attended the One-Hour Technical Presentation,
I-155 / US 412 Bridge over Mississippi River Scour Countermeasures Background and Technical Presentation,
presented by Contech Engineered Solutions LLC on Wednesday, September 21, 2021.
Program Sponsored by: Contech Engineered Solutions
Presented by: Aaron Clauson, P.E.
Discussion Included: Case study for evaluation of scour countermeasures on Mississippi River
Duration: 1.0 hours