Not rendering correctly? View this email as a web page here.
CONTECH | ENGINEERED SOLUTIONS
 
 
CONTECH® ENGINEERED SOLUTIONS
 
October 2021
 
 
Belmont Park Arena
 
 
Belmont Park Arena
Elmont, New York
 
CDS Hydrodynamic Separator Pretreats Stormwater
 

During construction of the new Belmont Park Arena, local regulations required pretreatment of 100% of the Water Quality Volume from any new development. Due to the flow rates, site constraints and the budget, a CDS® Hydrodynamic Separator was the best choice for the project.

 
Read More
 
 
 
 
Building Bridges
 
Beavers Bend Lake
Beavers Bend Lake
Beavers Bend, Oklahoma
 
CON/SPAN O-Series Replaces Damaged Structure
 
After a large storm event washed out a two cell box culvert downstream of a U.S. Army Corps of Engineers control-release spillway, a CON/SPAN® O-Series® Twin-Leaf Bridge System was selected as the best solution for its aesthetics and cost effectiveness.
 
Read More
 
 
 
 
Robertson Ranch Wildlife Crossing
Robertson Ranch Wildlife Crossing
Carlsbad, California
 
MULTI-PLATE Provides Safe Passage for Wildlife
 
In order to fulfill requirements from the California Department of Fish and Wildlife and the Army Corps of Engineers, a wildlife crossing was needed beneath Gage Road. A MULTI-PLATE® was selected as the best option due to the large cover requirements.
 
Read More
 
 
 
 
Conveyance
 
PSC Metals Culvert Reline
PSC Metals Culvert Reline
Beaver Falls, Pennsylvania
 
HEL-COR Relines Existing Culvert
 

When a sink hole developed near an existing culvert, it was decided that the best way to address the potential failure while limiting road closures would be to utilize HEL-COR® to reline the culvert.

 
Read More
 
 
 
 
 
Pipe Solutions Blog
 
Glycol and Chemicals and Waste - Oh My!
 
  Glycol and Chemicals and Waste — Oh My!
   
  Being in the wastewater industry, I felt an unexpected sense of pride when my 5-year-old daughter asked me about “poo” as she sat in her car seat on the way to school. I cheerfully started to explain how pipes carry waste to the treatment center, but she interrupted with “Daddy, Winnie the Pooh lives in the Hundred Acre Wood”  … sigh. It’s times like that when I’m  glad there are blogs to share information on topics that many family members may not be too concerned about… like wastewater pipe systems.  
 
  Read More
 
 
 
 
 
Stormwater Blog
 
Maintenance Considerations for High-Flow Bioretention Systems
 
  Maintenance Considerations for High-Flow Bioretention Systems
   
  High-flow bioretention systems target the removal of suspended solids, total and dissolved nutrients and metals, oil and grease, trash, and debris. Components typically include plants, mulch and specially designed filter media mixtures often contained in a concrete container. The mulch layer and filter media capture and immobilize pollutants during storm events. Between storms, those pollutants decompose, volatilize, and are incorporated into the biomass of the system’s micro/macro fauna and flora. 
 
  Read More
 
 
 
 
NEWSWORTHY - CONTECH EDUCATIONAL WEBINAR
 
Webinar_Hubspot2
Planes, Trains and Automobiles - Innovative Structures Solutions
 
Wednesday | November 17 | 1:00 PM EST
 
Join Contech’s leading experts as we explore Plate, Precast, Truss and Rolled Girder prefabricated solutions and the role that Contech Structures play in getting people and presents safely "Home for the Holidays." 
 
Register Now
 
 
 
 
 
Upcoming Events
 
 
 
 
Contech will be participating in the following events, and we invite you to visit us!
 
ASDSO Southeast Regional Conference in Charleston, South Carolina - November 29-December 2, Booth #217
 

Share Site Solutions

   
© 2021 Contech Engineered Solutions LLC