---
title: Site Solutions January 2018
---

 SiteSolutions shares the latest technologies, products, and applications through case studies, blogs, and more with our project partners.

| CONTECH \| ENGINEERED SOLUTIONS       January 2018         In This Issue of SiteSolutions         Feature: CDS Units Capture Trash   Building Bridges: Pedestrian Truss   Conveyance: Glycol Storage   Hard Armor: Improved Boat Launch Pipe Solutions Blog   Stormwater Blog   ASCE Interchange   Upcoming Events         San Jose Trash Capture - San Jose, California   CDS Units Separate Trash from Stormwater Runoff   In Spring 2017, the City installed nine CDS®  hydrodynamic separators to meet their latest deadline for trash capture. The CDS is a hydrodynamic separator that uses swirl concentration and continuous deflective separation to screen, separate and trap trash, debris, sediment and hydrocarbons from stormwater runoff.    Read More         BUILDING BRIDGES   Bridge Street over Presumpscot River Westbrook, Maine   Continental Replaces Deteriorating Structure   The Maine Department of Transportation replaced the existing vehicular bridge located on Bridge Street with a Keystone®style, Continental® Pedestrian Truss for its aesthetics and ability to blend well with the newly revitalized area.   Read More         CONVEYANCE   DFW International Airport Dallas, Texas   DuroMaxx Selected as Glycol Storage Tank Solution   DFW International Airport selected DuroMaxx® steel reinforced polyethlene (SRPE) pipe as the optimum collection, storage and treatment system. Runoff from the underground storage chamber is pumped to a treatment system constructed above.    Read More         HARD ARMOR   Mackey Ford on the Scioto River Lockbourne, Ohio   ArmorFlex Improves Boat Launch   When a canoe launch became unsafe due to the river repeatedly washing out the existing access road, the Ohio Department of Natural Resources (ODNR) installed ArmorFlex® mats to provide an improved approach to the ramp.    Read More           Pipe Solutions Blog       When Is It Too Late To Do a Reline Project?       When a culvert or storm sewer reaches the end of its useful service life, the option to excavate and replace is commonplace. However, having the additional option to reline the existing structure to provide a structural solution can save significant time and money.   But when it is too late?     Read More           Stormwater Blog       Don’t Bypass Good Design Part 1: Offline Vs. Online       Months of design, pages of specifications, and tens or even hundreds of thousands of dollars may go into the design of a stormwater treatment system. So why do we spend so little time thinking about the flow control devices that make them work? This is part one of a two-part series on bypass design and focuses on external diversion structures as compared to treatment units with internal bypass capability.     Read More         ASCE Interchange   Nonverbal Communication Speaks Volumes in the Workplace     In this edition of ASCE Interchange, learn why nonverbal communication is more important than what you say, as ASCE interviews United States Military Academy associate professor Brock Barry, Ph.D., P.E., F.ASCE.   Watch Video           Upcoming Events         Contech will be participating in the following events, and we invite you to visit us!   Underground Construction Technology International Conference & Exhibition (UCT) in New Orlean, Louisiana - January 30-February 1, Booth #724   SME Mining Show in Minneapolis, Minnesota - February 25-28, Booth #2630   DBIA Wastewater in Portland, Oregon - March 19-21, Booth #503   DBIA Transportation in Portland, Oregon - March 21-23, Booth #703       Share Site Solutions      © 2017 Contech Engineered Solutions LLC    |
| --- |