American Center for Mobility at Willow Run
 
 
American Center for Mobility at Willow Run
Ypsilanti, Michigan
 
BridgeCor Provides Tunnel at Driverless Test Track
 

The connected and automated vehicle (CAV) research facility recently built by the American Center for Mobility is a proving ground to the growing CAV technology market allowing for product testing, development, validation, and certification. The 500-acre, driverless facility includes a 2.5-mile highway loop, two double overpasses, a railroad crossing, intersections, roundabouts, and a tunnel. Due to its cost effectiveness, a BridgeCor® Deep Corrugated Structural Plate was selected as the best option for the curved, 704-foot long tunnel.

 
Read More
 
 
 
 
Stormwatch
 
body_img2-007237-edited.jpg
Padden Creek Estuary
Bellingham, Washington
 
Vortechs and Filterra Improve Water Quality
 

With estuary restoration essential to the area, a system consisting of a Vortechs hydrodynamic separator to pretreat the water before it entered a Filterra Bioscape was selected as the best option. The result was one easy to maintain structure.

 
Read More
 
 
 
 
Conveyance
 
body_img2-007237-edited.jpg
Germantown Road Reline
Gaithersburg, Maryland
 
Deteriorating Culvert Restored with Tunnel Liner Plate
 

When a culvert was severely deteriorated and in need of repair, it was decided that the best option was to reline it with Aluminum Tunnel Liner Plate. TLP was selected for its ability to be assembled inside the host pipe, while also providing a safe working environment. 

 
Read More
 
 
 
 
Retaining Wall
 
body_img2-007237-edited.jpg
Main Event Entertainment
Independence, Missouri
 
On-site ingenuity made for safe installation
 
Issues with a large waterline that cropped up on site for a retaining wall installation team were conquered with science, meticulous precaution, and creative collaboration.
 
Read More
 
 
 
 
 
Pipe Solutions Blog
 
Reline Considerations for Root Intrusion
 
  Reline Considerations for Root Intrusion, Compromising Joints, and Void Detection
   
  After recently completing a PDH article for Informed Infrastructure entitled, "How to Design a Culvert Reline Project," I thought it apropos that we take some time here to answer a few more questions regarding reline that I have received over the course of time. So without further ado and in no particular order, let's delve into the World of Reline.
 
  Read More
 
 
 
 
 
Stormwater Blog
 
Durability of Aluminized Type 2 Corrugated Steep Pipe Detention Systems
 
  Durability of Aluminized Type 2 Corrugated Steep Pipe Detention Systems
   
  This issue includes a short video to better visually illustrate the durability and general advantages of Aluminized Type 2 (ALT2) corrugated steel pipe (CSP) detention/infiltration systems. In the video, a local Contech sales engineer performed an inspection of a 10-year old, 96-inch diameter, ALT2 CSP system located in Palatine, IL at Fremd High School.
 
  Read More
 
 
 
 
 
Upcoming Events
 
 
 
 
Contech will be participating in the following events, and we invite you to visit us!
 
Pipelines 2018 in Toronto, Ontario, Canada - July 15-18
 
LID Conference 2018 in Nashville, Tennessee - August 12-15
 
StormCon in Denver, Colorado - August 13-15, Booth #405 & 407
 
APWA PWX 2018 in Kansas City, Missouri - August 26-28, Booth #2823
 
 
 

Share Site Solutions

    
© 2018 Contech Engineered Solutions LLC